BMRCL Power Supply Systems

BMRCL Trackwork System

Mumbai Monorail HT Power Supply and Building Services System

Pre-tender Advisory - 25kV OHE System

Procurement-cum-Maintenance of EMU

CDM Project – Car Transportation Modal Shift

MIAL Cargo Projects – MEP Concept Design

Hyderabad Metro: Preliminary Track Design

Power System Detail Egineering(RINL Vizag Steel Plant)

Technical Audit of Earthing & Bonding and Drainage Systems of Delhi Airport Metro Project

Pre-tender Design and Technical Services for Rehabilitation of Kolkata Metro trains

Alignment Design for Hyderabad Metro Rail Project (May 2011-)

Pre-tender Services for Pune-Wadi-Guntakal Railway Electrification (Oct 2011-Dec2011)

Interface management, Trackwork design, strategic planning for MEGA (Jan 2012-)

Design of Steel Sleeper

Management consultancy for development of Business plan for railways sector (March 12-April 12)

Bid Preparation support for O&M Contract for Delhi Airport Line (April 2011-May 2011)

Rolling Stocks Advisory

Train Control & Telecommunication System Advisory

Railway Maintenance Depot detailed design/ Advisory

Pre Tender Trackwork advisory services for Riyadh Metro (Feb 2013 –March 2013)

Detailed Design of two major depots of MEGA (April 013-)

Pre Tender Advisory for Track work system (May 2013 – June 2013)

Rolling Stock and Slignaling and Telecom Technical advisory services (June 2013-2014)

Advisory services for Metro Railway Projects (Sept 2013-Dec 2013)

Independent Quality & Safety Consultancy Services to Kochi Metro Rail (Feb 2014-)

Pre-tender technical advisory services electrification system (Feb 2014-Dec 2014)

Pre-tender engineering for Mumbai Metro Line 3 Underground project (Jan 2015-Sept 2015)

Pre-tender technical advisory services for Chennai Monorail Project (Feb 2015-Dec 2015)

Traction Power Supply (25kV ac, 1500V/750V dc) design at ALSTOM factory (April 2015-)

Design advisory services for telecom system for EDFC package CP 203 (May 2015-Aug 2015)

Design of Telecom Systems of Western DFC Rewari-Vadodara section (July 2015-)

Rolling Stock and Power Supply System Advisory Services for Nagpur Metro Rail project(Nov 2015-)

Bilaspur-Raigad 4th Line Project (June 2016-) South East Central Railway

Vizag Metro Rail Project Technical Consultancy Services (Aug 2016-)

Railway Electrification System Process Study (Dec 2016-)

OHE Layout Plan preparation (Dec 2016-)

OHE components' Finite Element Analysis (FEA) Study (Oct 2016-)

Nagpur Tubular Portal(JAN 2017-)

Amarawati-Vijaywada-Guntur-Tenali High Speed Circular Rail(Feb 2017-)

Jabalpur and Gwalior MRTS Feasibility Study (May 2017-)

OHE Modification For IRSDC(May 2017-)

Signaling System Design Western DFC Rewari-Vadodara section (May 2017-)

Pune Metro System Procurement Advisory(July 2017-)

LIPL BROCHURE

Home » Project Delivered / Under Execution

BMRCL Power Supply Systems

System studies, simulation studies, detailed design,

BOQ, tender specification (2 corridors of 41km)


 

 

 

 Note: SREI is main consultant to BMRCL and LIPL is appointed by SREI


BMRCL Trackwork System

Alignment design, Trackwork detailed design, BOQ,

tender specification (2 corridors of 41km)

 

 

 

 

 

Note: SREI is main consultant to BMRCL and LIPL is appointed by SREI


Mumbai Monorail HT Power Supply and Building Services System

First Monorail Project in India: 20km corridor
(Chembur to GMC) with 17 stations
 

Pre-tender Advisory - 25kV OHE System

 

           2 corridors – partly underground and elevated

          Projects for power supply design and build package

          design for mainlines and depot


Procurement-cum-Maintenance of EMU

           (20+ years) procurement-cum-maintenance agreement 

           with private entity for EMUs (Suburban and Intercity)

 

 

 

 

Note: Mott MacDonald is main consultant to Ministry of Railways and LIPL is sub-consultant to Mott MacDonald


CDM Project – Car Transportation Modal Shift

          Plant to Port for export by railways instead of trucks

          ‘transport sector expert’

 

 

 

 


Note: This project was handled by Anil Jangid individually previously in March / April 2010


MIAL Cargo Projects – MEP Concept Design

          Master Plan envisage development of state-of-the-art 

          Air Cargo Projects  - Total three projects (A, B & C) with foot print

          of the order of 20000 sqm with 2/3 floors 

 

Concept designing of:

 

 

Submission of design report and drawings



Note: AECOM is main consultant to MIAL and LIPL is sub-consultant to AECOM


Hyderabad Metro: Preliminary Track Design

 

 

          with combined route of about 71km and 66 stations and 3 Depots.

          Manual of Specifications and Standards … regarding trackwork

          and ballasted (depots) tracks;

 

 

 

 

Note: AECOM is main consultant to L&T SPV and LIPL is sub-consultant to AECOM


Power System Detail Egineering(RINL Vizag Steel Plant)


 

          of Vizag Steel Plant expansion

 

          by L&T to perform design engineering

          and consulting services, including:

 

 

          distribution at 11kV and 415V)

          cables, DG, battery, HVAC, earthing etc.)


Technical Audit of Earthing & Bonding and Drainage Systems of Delhi Airport Metro Project

Delhi Airport Metro Express Private Limited (DAMEPL) engaged

LIPL for performing technical audit of the following:

 

 

          viz.Power Supply, LV system, HVAC, SIG, COM, PSD , BHS etc.

 

          requirements of concession agreement

          Audit Report duly suggesting remedial measures


Pre-tender Design and Technical Services for Rehabilitation of Kolkata Metro trains

The scope of work envisaged by Kolkata Metro for rehab of 7 nos. old NGEF rakes included new corten steel shells, replacement of complete pneumatic pipe lines / reservoirs with SS material, complete rewiring, fitment of RMPU, automatic door system, interiors, PA system & CCTV system, static inverters for RMPU & auxiliary power requirement etc.

M/s Titagarh Wagon Limited engaged LIPL for assisting them for preparation of bid for rehabilitation of 7 rakes of Kolkata Metro. The services delivered by LIPL included:
 

Alignment Design for Hyderabad Metro Rail Project (May 2011-)

 
 
1.L&T Construction (formerly ECC) is trackwork contractor for
Hyderabad Metro Rail Project.
 
2.L&T engaged LIPL for detailed design of Alignment for first
section of about 9km.
 
3. LIPL delivered the detailed design of alignment which included:
 
   Preparation of detailed report of test of various alignment criteria
 
  Alignment designed using alignment software and output provided in CAD form including horizontal  and vertica profiles 

Pre-tender Services for Pune-Wadi-Guntakal Railway Electrification (Oct 2011-Dec2011)

 
 
1. RVNL notified three electrification projects (Pune-Guntakal-Wadi-
Raichur sections - total of about 380 route-km / 940 track-km) for
bidding by eligible firms. The project envisaged 25kV AC electrification
of these sections alongwith few big yards. A total of 7 nos. of traction
substations and about 15 nos. switching posts were envisaged in the
above-mentioned sections.

 

2. M/s Elecnor Infrastructures, Spain engaged LIPL for assisting them
for preparation of bid. The services delivered by LIPL included:
 
 
Preparation of complete Technical proposal
 
Explanation / description of work
 
Detailed comments on the complete tender
 
Preliminary system drawings
 
Work program in Primavera
 
Resource scheduling and mobilization scheduled
 
Technical Particulars of equipment
 
Cost estimation for price bid

Interface management, Trackwork design, strategic planning for MEGA (Jan 2012-)

 
 
1. Metro Link Express for Ahmedabad and Gandhinagar (MEGA)
Co Ltd is a special purpose company constituted by Government
of Gujarat for implementation of metro rail system .

 

2. MEGA have appointed LIPL as their advisor for :
 
 
Appointment of General Consultants
 
Management of Interfaces  across all systems and infrastructure
 
Preparation of standard bid documentations
 
Preliminary design of trackwork
 
Planning work

Design of Steel Sleeper

 
 
 
1. M/s VEERA Technotrec is an approved supplier of IR for
supply of sleepers and other railway materials. For their
one African project, dual gauge sleeper design was
requested to be performed by LIPL.
 
2. LIPL performed the design as per AS 1085.17-2003, which
included the following:
 
 
10 mn gross tones loading
 
Ballast depth of 250-300mm
 
Axle load of 25 t
 
Design life of sleeper 500 mn gross tone years
 
Clamping force at rail seat 20 kN
 
L/V ratio of 0.75
 
 
3. Designs were tested for meeting the standard requirements
and detailed design report  was submitted

Management consultancy for development of Business plan for railways sector (March 12-April 12)

 
 
 
1. SMEC  is an internationally renowned firm in the areas of
engineering and project management for infrastructure sectors.
SMEC intended to develop rail business in India and engaged
LIPL as advisor.
 
2. LIPL developed a comprehensive business plan for  SMEC for
  rail sector in India.
 
The business plan covered:
 
Mass transit systems
 
Urban rail systems
 
Mainline railways
 
High speed railways
 
Freight railways
 
 
3. The business plan covered the scenario, competitors, SWOT, organization / resources building, Key Actions etc. with a time frame.

Bid Preparation support for O&M Contract for Delhi Airport Line (April 2011-May 2011)

 
 
1. M/s Indian City Properties Limited, a Thaper Group Company,
inthe business of facility management decided to bid for MEP O&M
Contract for Delhi Airport Line
 
2. LIPL was engaged to advise on bid preparation, cost estimation,
resources requirements and technical due diligence  for the following
assets:
 
LV power distribution infrastructure
 
Pumping installations
 
Lighting system
 
Earthing system
 
Ventilation system
 
Fire fighting system
 
 
3. The bid was successfully submitted by M/s ICPL

Rolling Stocks Advisory

          Multiple Units).

  • Detailed specifications of bogies, propulsion equipment, 

          carbody, brake system and other components.

  • Maintenance planning.
  • Costing of rolling stock – capital and O&M cost study.
  • Interface management (with other systems and infrastructure).
  • Tender documentation  (including long term procurement-cum-maintenance  contract structuring.
  • Bidding process assistance. 
 
 
 
 
 
 
 
 
 

Train Control & Telecommunication System Advisory

  • Preliminary Train operation plan.
  • Detailed specifications metro telecommunication  system 

          and subsystem specifications.

  • Cost estimation for train control and telecom systems.
  • Interface management (with other systems and infrastructure).
  • Tender documentation.
  • Bidding process assistance.
 
 
 
 

Railway Maintenance Depot detailed design/ Advisory

  • Maintenance facilities planning. 
  • Detailed design (structural, E&M, machinery / plant etc.).
  • Cost estimation.
  • Interface management (with other systems and infrastructure). 
  • Tender documentation.  
  • Bidding process assistance. 
 
 
 
 

Pre Tender Trackwork advisory services for Riyadh Metro (Feb 2013 –March 2013)

          trackwork system, L&T engaged LIPL for rendering pre-bid services

  1. Evaluation of bid documents prepared by L&T.
  2. Architectural Description including Safety and Reliability Design.
  3. Sketch Principle along with Photos and Schematics.
  4. Input for Reliability figures observed during the last 5 years for 
    guide way system.

Detailed Design of two major depots of MEGA (April 013-)

  • Overall operational planning for full network.
  • Detailed design of maintenance depots (Indroda and Motera depots):
  1. Layout design
  2. Architectural &Structural design
  3. M&P specification / procurement
  4. Electrical design
  5. Fire system design
  6. HVAC design
  7. Security system design
  8. Interface  elaboration 
  9. Procurement documentation 
  10. Specifications, BOQ and cost estimation
 
 
 
 
 
 

Pre Tender Advisory for Track work system (May 2013 – June 2013)

           the area of rail track system. 

           design  for Navi Mumbai metro rail project

  • LIPL performed the following activities:
  1. Detailed study of alignment (about 12km) and depot
  2. Estimation of quantities of various track components (rails, 
    fastening, check rails, sleepers, turnouts etc.)
  3. Preparation of detailed BOQ for entire trackwork
  4. Preparation of interface drawings 
 

Rolling Stock and Slignaling and Telecom Technical advisory services (June 2013-2014)

  • LIPL performed the following activities:
  1. Detailed review of technical and general specifications.
  2. Upgrading the specifications to DTO/UTO conformance. 
  3. Detailed review of other parts of tender documents (ITT, 
    Pricing Document,  Tech proposal requirements etc.).
  4. Updation of interfaces definition with other systems and 
    infrastructure. 
  5. Assistance during bidding process regarding technical clarifications. 

Advisory services for Metro Railway Projects (Sept 2013-Dec 2013)


Independent Quality & Safety Consultancy Services to Kochi Metro Rail (Feb 2014-)


Pre-tender technical advisory services electrification system (Feb 2014-Dec 2014)

  1. Overhead collection system design and BOQ
  2. Pegging plans of OCS system
  3. Traction installations (TSS, SP, SSP) design and BOQ
  4. SCADA system design and BOQ
  5. Building services (E&M, BMS, HVAC, Fire system etc.) design and BOQ




Pre-tender engineering for Mumbai Metro Line 3 Underground project (Jan 2015-Sept 2015)

  1. LV power distribution design
  2. Emergency power supply system design
  3. Earthing system design
  4. Lighting system design
  5. Cable system design and cable support infrastructure
  6. Fire detection and fire fighting system design
  7. Building management system design
  8. BOQ and cost estimation
  9. Pre-bid support services

Pre-tender technical advisory services for Chennai Monorail Project (Feb 2015-Dec 2015)

  1. Preliminary design of power supply (receiving substations, 33kV cable distribution, substations) and traction system (1500V dc).
  2. Half height platform screen door system design and specification.
  3. Communication system preliminary design (DTS, CCTV, PAS, PIDS, Radio, telephone, BMS etc.).
  4. E&M system design (LV distribution, lighting, cabling, HVAC, fire detection & fighting, water supply etc.).
  5. BOQ and cost estimatio.

Traction Power Supply (25kV ac, 1500V/750V dc) design at ALSTOM factory (April 2015-)

  1. Power supply scheme conceptualization covering 25kV ac OCS, 1500V dc OCS / third rail / stinger and 750V dc third rail / stinger.
  2. Detailed design of dual voltage (1500V / 750V dc) substation.
  3. Protection and control scheme.
  4. OCS, third rail and stinger scheme.
  5. Specification, BOQ, cost estimation and assistance for engaging contractors.

Design advisory services for telecom system for EDFC package CP 203 (May 2015-Aug 2015)

  1. Preliminary design of telecom subsystems viz. FOTS, GSM-R, Network Management System, Master Clock System, Telephone system, 48V PS system etc.
    1. BOQ and cost estimation.
  2. Assistance during bidding process.
  3. Bid level SHE documentation.
  4. Technical proposal.

Design of Telecom Systems of Western DFC Rewari-Vadodara section (July 2015-)

  1. Fiber Optic Transmission network
  2. Data networking system, wifi system
  3. GSM-R system
  4. Telephone systems
  5. 48V dc power supply system
  6. CCTV system for OCC

Rolling Stock and Power Supply System Advisory Services for Nagpur Metro Rail project(Nov 2015-)

  1. Rolling stock
  2. Power supply system
  3. Traction System

Bilaspur-Raigad 4th Line Project (June 2016-) South East Central Railway

  1. Review of project report and cost estimates
  2. Assistance for drafting of RFQ and RFP Documents
  3. Preparing technical schedules
  4. Bidding process assistance

Vizag Metro Rail Project Technical Consultancy Services (Aug 2016-)

  1. Review of DPR for technical / system parameters viz. alignment, track, stations, power supply, traction, rolling stock, signaling, telecom, AFC, PSD etc.
  2. Optimization strategies for capital costs and O&M costs.
  3. Project phasing.
  4. Review and updating of cost estimates.
  5. Comprehensive Review Report of the above.

Railway Electrification System Process Study (Dec 2016-)

•M/s Sterlite Power has engaged EY for railway electrification market assessment and stakeholder engagement
•One of the key intents of the engagement is ‘technology led railway electrification’. LEAP has been associated with EY and the scope incudes:
–Study of railway electrification process, time frame for various activities etc.
–Exploring possibilities of technology solutions and innovative methods for productivity enhancement and reduction of speed of construction
–Model organizational set up on EPC contractor end for railway electrification
–Suggestions on clauses for incorporation in EPC/PPP tenders enabling / mandating technology led solutions

OHE Layout Plan preparation (Dec 2016-)

•Nagpur Metro Rail project involves about 38 km elevated metro corridors.
 
•LEAP has been engaged by NMRCL for preparation of detailed LOP for OHE system using appropriate software (Bentley’s PROL).
 
•The scope involves Reach 1 and Reach 3 sections of Nagpur Metro; totaling to about 18 route-km or about 38 track-km

OHE components' Finite Element Analysis (FEA) Study (Oct 2016-)


Nagpur Tubular Portal(JAN 2017-)

  1. review of detailed design of portals,
  2. Development of fittings for cantilever attachment to tubular portals
  3. preparation of technical submissions for regulatory approval,
  4. review of other traction related designs.

Amarawati-Vijaywada-Guntur-Tenali High Speed Circular Rail(Feb 2017-)

  1. Alignment selection and design
  2. System selection
  3. Operation and maintenance planning
  4. Cost estimation
  5. Assisting for completion of FR and DPR

Jabalpur and Gwalior MRTS Feasibility Study (May 2017-)

  1. Review of current situation and previous studies
  2. Reconnaissance surveys and corridor identification
  3. Traffic surveys and transport demand modeling
  4. Transit oriented development planning
  5. Multi criteria analysis and system selection
  6. Cost estimation, Financial and economic analysis
  7. Financing models
  8. Implementation and institutional arrangement
  9. Feasibility report completion

OHE Modification For IRSDC(May 2017-)

  1. Minimum height of overline structure above rails
  2. Provisions regarding openings / windows in the concourse
  3. Measures for preventing bird menace for the OHE
  4. Earthing of structures
  5. General arrangement of OHE support structures under the concourse
  6. Loading due to OHE on civil structures.

Signaling System Design Western DFC Rewari-Vadodara section (May 2017-)

  1. Cable Core Plan (CCP) and cable quantities for stations (crossing and jucntion stations)
  2. Cable Core Plan (CCP) and cable quantities for mid sections
  3. Cable Route Plan and Track Crossing Plan for stations and mid sections
  4. Location case designs

Pune Metro System Procurement Advisory(July 2017-)

  1. Rolling stock
  2. Power Supply
  3. Traction system
  4. Signaling system
  5. Telecom system
  6. Platform doors
  7. Fare collection system
  1. ITB, Pricing Document
  2. Specifications
  3. Tender drawings
  4. Conditions of contract
  5. Pre-bid assistance